Company name

N/A

Project number

12192-03

Category A projects could result in potentially significant environmental and/or social risks and impacts, which are diverse, irreversible, or unprecedented that may extend beyond the boundaries of the actual project site or facilities. In principle, Category A includes projects which have significant impacts on protected or sensitive areas21 and/ or vulnerable groups.

E&S category
tooltip

A

Country

Peru

Sector

Transport

Status

Proposed

Disclosed date

06/04/2021

Projected date at which a project will be put forward for the Board of Executive Directors’ approval.

Projected board date
tooltip

09/21/2021

Approval date

N/A

Signed date

N/A

Sponsoring entity

N/A

Team leader

Malpartida Velasquez, Aldo Rafael

Investment type

Financing requested

USD $ 200,000,000

Syndicated amount

N/A

Financing amount

USD $ 200,000,000

Currency

USD

Project scope and objective

Lima Airport Partners S.R.L. ("LAP" or "the Company") is the exclusive concessionaire to build, operate,
and maintain Jorge Chávez International Airport ("AIJC" or "Lima Airport"), the main airport facility for the
movement of cargo and passengers to domestic and international destinations in Peru. The AIJC is located
in the Constitutional Province of Callao, and is the gateway to the country (85% of international O/D
passenger traffic) and a very important hub for South America. Lima Airport is one of the most important
in the region, connecting Lima with 19 domestic and 24 international destinations and serving 16 airlines.

In 2015, LAP started creating the conceptual design for the AIJC expansion. Following the handover of the
land in October 2018, LAP started construction in 2019. The expansion project is divided into 3 work
packages (WP). To date, the first work package (WP1) for earthworks and demolition has been completed;
the second (WP2), which includes the construction of a new control tower and runway, is in progress and
is expected to be completed in July 2022; and the third (WP3), which includes the design and construction
of a new passenger terminal and aircraft aprons, will be awarded to a contractor in August 2021 and
construction is expected to take approximately 38 months. The total cost of this expansion is
approximately US$1.7 billion.

This transaction will finance the design, development, and construction of the new passenger terminal
and aircraft apron, as well as the repayment of an existing bridge loan acquired by LAP for the execution
of the initial works (collectively "the Project").

For inquiries, comments and information requests about the project

Request information

Learn more about how we provide private-sector solutions in the region.

Client files

This section provides the key environmental and social assessment documents produced by the client for this project.

LIMA AIRPORT - ENVIRONMENTAL AND SOCIAL STRATEGY (ESS).PDF

654.1 Kb

AEROPUERTO DE LIMA - APROBACIÓN MEIA SENACE.PDF

229.3 Kb

EIA AEROPUERTO DE LIMA - VERSIÓN ORIGINAL NOVIEMBRE 2001.PDF

2.5 Mb

MEIA AEROPUERTO DE LIMA - ANEXO DE MAPAS TEMÁTICOS.PDF

9.0 Mb

MEIA AEROPUERTO DE LIMA - CAP 0.0 ÍNDICE GENERAL.PDF

972.4 Kb

MEIA AEROPUERTO DE LIMA - CAP 01.0 RESUMEN EJECUTIVO.PDF

7.9 Mb

MEIA AEROPUERTO DE LIMA - CAP 02.0 GENERALIDADES.PDF

863.9 Kb

MEIA AEROPUERTO DE LIMA - CAP 03.0 MARCO LEGAL E INSTITUCIONAL.PDF

1.2 Mb

MEIA AEROPUERTO DE LIMA - CAP 04.0 DESCRIPCIÓN DEL PROYECTO.PDF

5.0 Mb

MEIA AEROPUERTO DE LIMA - CAP 05.1 ÁREA DE INFLUENCIA.PDF

26.5 Mb

MEIA AEROPUERTO DE LIMA - CAP 05.2 LÍNEA DE BASE FÍSICA.PDF

7.3 Mb

MEIA AEROPUERTO DE LIMA - CAP 05.3 LÍNEA DE BASE BIOLÓGICA.PDF

4.3 Mb

MEIA AEROPUERTO DE LIMA - CAP 05.4 LÍNEA DE BASE SOCIAL.PDF

6.1 Mb

MEIA AEROPUERTO DE LIMA - CAP 06.0 PARTICIPACIÓN CIUDADANA.PDF

1.2 Mb

MEIA AEROPUERTO DE LIMA - CAP 07.0 CARACTERIZACIÓN DE IMPACTOS.PDF

2.1 Mb

MEIA AEROPUERTO DE LIMA - CAP 08.0 ESTRATEGIA DE MANEJO AMBIENTAL.PDF

10.6 Mb

MEIA AEROPUERTO DE LIMA - CAP 09.0 VALORIZACION ECONOMICA AMBIENTAL.PDF

1.1 Mb

MEIA AEROPUERTO DE LIMA - CAP 10. PROFESINALES PARTICIPANTES.PDF

1.3 Mb

MEIA AEROPUERTO DE LIMA - CAP 11.0 BIBLIOGRAFÍA.PDF

712.0 Kb

For inquiries, comments and information requests about the project

Request information

Learn more about how we provide private-sector solutions in the region.

Contact information

For inquiries, comments and information requests about the project

Request information

Alternatively, you may also use the following contact information:

Client Contact

CONTACT NAME

Patricia Venero Espinoza

POSITION

Project Financing & IR Manager

PHONE NUMBER

(+51) 998 193 985

EMAIL

pvenero@lima-airport.com

IDB Invest Contact

EMAIL

requestinformation@idbinvest.org

PHONE

+1(202)-566-4566

ADDRESS

1350 New York Ave NW, Washington, DC 20005

COUNTRY OFFICES

IDB Invest Country Offices