Company name
American Industrial Park, S.A. de C.V. (“AIP”)
Project number
12362-01
Category B projects have potential environmental and/or social impacts and risks that are less adverse than those of a Category A and which are generally limited to the project site, largely reversible and can be mitigated via measures that are readily available and feasible to implement in the context of the operation.
E&S category
B
Country

El Salvador
Sector

Manufacturing
Status
In implementation
Disclosed date
12/10/2018
Projected date at which a project will be put forward for the Board of Executive Directors’ approval.
Projected board date 
12/14/2018
Approval date
01/15/2019
Signed date
06/23/2020
Sponsoring entity
N/A
Team leader
Briceno, Beatriz
Investment type
Syndicated amount
USD $ 1,250,000
Financing amount
USD $ 8,000,000
Currency
USD
Project scope and objective
American Industrial Park, S.A. de C.V. (AIP) is one of the main industrial parks in El Salvador with more than 190,000 m2 of industrial space, most of which houses international companies primarily in the textile sector. It has been in operation since 1993 and plans to invest in expansion of its industrial space and the installation of solar panels for own-use renewable energy.
IDB Invest is considering granting a long-term loan to finance installation of the solar plant, which will have a nominal capacity of 6.5 MW, for which the Nordic Development Fund is expected to provide a first loss guarantee for up to $1.25 million. The loan would also cover the construction of industrial space infrastructure, targeting the logistics and storage sector, with the construction of 17,000 m2 in a new park called the Sirius Industrial Park (SIP), which will belong to AIP, and will offer additional medical clinic services for the employees of the companies to be installed there. All of the above is called “the Project.”
Both AIP and its SIP expansion program are located on the Pan American Highway, 30 minutes from the country’s main seaport and close to rural cities outside the metropolitan area of greater San Salvador such as La Libertad, Santa Ana, and Sonsonate, where 48% of the population is concentrated.
The proposed loan has the following objectives: (i) to convert AIP into the first industrial park and free zone in El Salvador with a fully redundant power supply, which will serve as a model to be replicated; (ii) to help develop with AIP a plan for comprehensive utilization of wastewater for different uses in the park; and (iii) to increase employment opportunities in the zone by providing a greater supply of services for the logistics and storage sector in the zone, supplemented by an approach that integrates health with clinic services not existing in the area of expansion.
For inquiries, comments and information requests about the project
Request informationLearn more about how we provide private-sector solutions in the region.
Contact information
For inquiries, comments and information requests about the project
Request informationAlternatively, you may also use the following contact information:
Client Contact
CONTACT NAME
N/A
POSITION
N/A
PHONE NUMBER
(+503) 7852-7683
adonay.rosales@aristos.com.sv
IDB Invest Contact
requestinformation@idbinvest.org
PHONE
+1(202)-566-4566
ADDRESS
1350 New York Ave NW, Washington, DC 20005
Environmental and social review
IDB Invest conducts an environmental and social due diligence (ESDD) commensurate with the nature, scale, and stage of the project, and with its level of environmental and social risks and impacts. The ESDD will confirm the project E&S categorization and assess the project with respect to the client requirements in IDB Invest Environmental and Social Sustainability Policy. The results of the ESDD, including any identified gaps are described in the Environmental and Social Review Summary (ESRS) provided below. For projects approved as of 2016, any gaps with respect to IDB Invest's Environmental and Social Sustainability Policy at the time of the ESDD are addressed in the Environmental and Social Action Plan (ESAP) presented below, to comply with the date mentioned above.
ENVIRONMENTAL AND SOCIAL REVIEW
74.2 Kb