Company name
Concessionária da Rodovia MG-050 S.A.
Project number
12110-01
Category B projects have potential environmental and/or social impacts and risks that are less adverse than those of a Category A and which are generally limited to the project site, largely reversible and can be mitigated via measures that are readily available and feasible to implement in the context of the operation.
E&S category
B
Country
Brazil
Sector
Transport
Status
Hold
Disclosed date
06/17/2019
Projected date at which a project will be put forward for the Board of Executive Directors’ approval.
Projected board date
10/19/2020
Approval date
N/A
Signed date
N/A
Sponsoring entity
N/A
Investment Operations Department Contact
N/A
Investment type
Syndicated amount
N/A
Financing amount
USD $ 77,535,900
Currency
BRL
Project scope and objective
IDB Invest financing will allow for the expansion and improvement of approximately 371 kilometers of state highway, connecting metropolitan Belo Horizonte to the municipality of São Sebastião do Paraíso at the border with the state of São Paulo (the “Project”). The highway network cuts directly through 22 municipalities in Minas Gerais and influences 50 cities, home to 1.3 million inhabitants (i.e., 7.4% of the state’s population). It is estimated that 7.7% of Minas Gerais’ GDP (Gross Domestic Product) is concentrated in the MG-050 system catchment area.
The investment program, during the 25 years of the concession period, consists in the expansion and improvement of the existing highway, including 82.3 km of highway shoulder improvements 52.9 kilometers of new roads, 114 kilometers of third lane expansions, and construction of 17 interchanges, 12 bridges, viaducts and other structural works, as well as nine pedestrian overpasses or underpasses. IDB Invest will finance the investments executed from mid-2017 to 2022, improving road conditions and increasing user safety.
Project cost is R$1.3 billion, which will be financed by IDB Invest through a long-term loan in an amount not to exceed R$400 million with a term of up to 12 years; capital contribution and cash from operations of R$567 million and debentures of R$310 million.
For inquiries, comments and information requests about the project
Request informationLearn more about how we provide private-sector solutions in the region .
Contact information
For inquiries, comments and information requests about the project
Request informationAlternatively, you may also use the following contact information :
Client Contact
N/A
PHONE NUMBER
N/A
POST OFFICE ADDRESS
N/A
IDB Invest Contact
requestinformation@idbinvest.org
PHONE
+1(202)-566-4566
ADDRESS
1350 New York Ave NW, Washington, DC 20005
COUNTRY OFFICES
IDB Invest Country OfficesFor inquiries, comments and information requests about the project
Request informationLearn more about how we provide private-sector solutions in the region .
Environmental and social review
IDB Invest conducts an environmental and social due diligence (ESDD) commensurate with the nature, scale, and stage of the project, and with its level of environmental and social risks and impacts. The ESDD will confirm the project E&S categorization and assess the project with respect to the client requirements in IDB Invest Environmental and Social Sustainability Policy. The results of the ESDD, including any identified gaps are described in the Environmental and Social Review Summary (ESRS) provided below. For projects approved as of 2016, any gaps with respect to IDB Invest's Environmental and Social Sustainability Policy at the time of the ESDD are addressed in the Environmental and Social Action Plan (ESAP) presented below, to comply with the date mentioned above.
CATEGORY JUSTIFICATION
30.6 Kb
ENVIRONMENTAL AND SOCIAL REVIEW
29.3 Kb