Skip to main content

Company name

Sindicato Energético, S.A.

Project number

PE1114A-01

N/A

E&S category
tooltip

N/A

Country

Peru

Sector

Energy

Status

Completed

Disclosed date

05/07/2002

Projected date at which a project will be put forward for the Board of Executive Directors’ approval.

Projected board date
tooltip

06/19/2002

Approval date

06/19/2002

Signed date

N/A

Sponsoring entity

N/A

Investment Operations Department Contact

N/A

Investment type

Syndicated amount

N/A

Financing amount

N/A

Currency

USD

Project scope and objective

The project consists of a 15.4 MW hydroelectric plant, the Poechos Hydroelectric Project, to be constructed on the toe of the Poechos irrigation dam located in the district of Piura that is in the northern Peruvian province of Sullana approximately 30 km from the border with Ecuador. The project will obtain 45m3/s of water from the 930,000 million-m3 Poechos dam that was completed in 1979 to provide irrigation for 110,000 ha in the Chira and Piura valleys. The project will rely on flows of water dictated by irrigation demands and as such is expected to generate about 70GWh of electrical energy per year. The power plant project will consist of the following components: a steel penstock connected to an existing steel discharge pipe at the base of the dam, a powerhouse equipped with two Kaplan turbines which drive two 9.5 MVA generators, a switchyard located near to the powerhouse, and a 35 km long overhead transmission line from the switchyard to the Sullana substation of the national electrical grid. After exiting the generators the water will be discharged into the pre-project, energy dissipater of the Poechos dam and fed into the irrigation system. The energy to be produced by the Poechos Hydroelectric Project will be sold to Electronoroeste, S.A., the concessionary for energy distribution in northwestern Perú, under a Power Purchase Agreement. The total cost of the project is nearly US$16.3 million, of which the IIC will provide US$8,5 million under an A and B loan structure.

For inquiries, comments and information requests about the project

Request information

Learn more about how we provide private-sector solutions in the region .

Environmental and social review

IDB Invest conducts an environmental and social due diligence (ESDD) commensurate with the nature, scale, and stage of the project, and with its level of environmental and social risks and impacts. The ESDD will confirm the project E&S categorization and assess the project with respect to the client requirements in IDB Invest Environmental and Social Sustainability Policy. The results of the ESDD, including any identified gaps are described in the Environmental and Social Review Summary (ESRS) provided below. For projects approved as of 2016, any gaps with respect to IDB Invest's Environmental and Social Sustainability Policy at the time of the ESDD are addressed in the Environmental and Social Action Plan (ESAP) presented below, to comply with the date mentioned above.

ENVIRONMENTAL AND SOCIAL REVIEW

61.6 Kb

For inquiries, comments and information requests about the project

Request information

Learn more about how we provide private-sector solutions in the region .

Contact information

For inquiries, comments and information requests about the project

Request information

Alternatively, you may also use the following contact information :

Client Contact

EMAIL

N/A

PHONE NUMBER

N/A

POST OFFICE ADDRESS

N/A

IDB Invest Contact

EMAIL

requestinformation@idbinvest.org

PHONE

+1(202)-566-4566

ADDRESS

1350 New York Ave NW, Washington, DC 20005

For inquiries, comments and information requests about the project

Request information

Learn more about how we provide private-sector solutions in the region .