Company name
Bosques Solares de los Llanos 1, S.A.S. E.S.P Bosques Solares de los Llanos 2, S.A.S. E.S.P Bosques Solares de los Llanos 3, S.A.S. E.S.P
Project number
13420-01
Category B projects have potential environmental and/or social impacts and risks that are less adverse than those of a Category A and which are generally limited to the project site, largely reversible and can be mitigated via measures that are readily available and feasible to implement in the context of the operation.
E&S category
B
Country
Colombia
Sector
Energy
Status
Proposed
Disclosed date
05/10/2021
Projected date at which a project will be put forward for the Board of Executive Directors’ approval.
Projected board date
09/30/2021
Approval date
10/05/2021
Signed date
10/12/2021
Sponsoring entity
Matrix Renewables Colombia S.A.S.
Investment Operations Department Contact
Infrastructure and Energy Division
Investment type
Syndicated amount
USD $ 8,400,000
Financing amount
USD $ 15,709,900
Currency
COP, USD
Project scope and objective
The Bosques Solares Los Llanos project (the "Project" or "BSL") of Matrix Renewables Colombia S.A.S. (the "Company" or "Matrix") is located in the municipality of Puerto Gaitan in the province of Meta, Colombia. The Project involves the construction and operation of: (i) three contiguous solar generation projects (BSL1, BSL2, and BSL3) with a total aggregate installed capacity of 81.7 Mega Watt peak (MWp), (ii) a 2,711-meter long, 34.5 kilovolts (kV) transmission line (TL), with 1,714 meters of underground wiring and 996 meters of overhead wiring, and (iii) the retrofitting of Altillanura electrical substation from Electrificadora del Meta S.A. (EMSA).
The three BSLs were recently acquired by the Company from Trina Solar, a photovoltaic module manufacturing and installation company, which was also in charge of the construction of the three solar farms. The Project is in a leadership transition stage and, as of March 2021, it registers BSL1 and BSL2 in the operational phase under Trina Solar's guidelines, while BSL3 is in the technical testing phase before entering its operational phase.
For inquiries, comments and information requests about the project
Request informationLearn more about how we provide private-sector solutions in the region .
Contact information
For inquiries, comments and information requests about the project
Request informationAlternatively, you may also use the following contact information :
Client Contact
N/A
PHONE NUMBER
N/A
POST OFFICE ADDRESS
N/A
IDB Invest Contact
requestinformation@idbinvest.org
PHONE
+1(202)-566-4566
ADDRESS
1350 New York Ave NW, Washington, DC 20005
COUNTRY OFFICES
IDB Invest Country OfficesFor inquiries, comments and information requests about the project
Request informationLearn more about how we provide private-sector solutions in the region .
Environmental and social review
IDB Invest conducts an environmental and social due diligence (ESDD) commensurate with the nature, scale, and stage of the project, and with its level of environmental and social risks and impacts. The ESDD will confirm the project E&S categorization and assess the project with respect to the client requirements in IDB Invest Environmental and Social Sustainability Policy. The results of the ESDD, including any identified gaps are described in the Environmental and Social Review Summary (ESRS) provided below. For projects approved as of 2016, any gaps with respect to IDB Invest's Environmental and Social Sustainability Policy at the time of the ESDD are addressed in the Environmental and Social Action Plan (ESAP) presented below, to comply with the date mentioned above.
LOS LLANOS - ENVIRONMENTAL AND SOCIAL REVIEW SUMARY (ESRS)
299.8 Kb
LOS LLANOS - ENVIRONMENTAL AND SOCIAL ACTION PLAN (ESAP)
145.9 Kb