Skip to main content

Company name

Piaui Niquel Metais S.A.

Project number

16444-01

Category A projects could result in potentially significant environmental and/or social risks and impacts, which are diverse, irreversible, or unprecedented that may extend beyond the boundaries of the actual project site or facilities. In principle, Category A includes projects which have significant impacts on protected or sensitive areas21 and/ or vulnerable groups.

E&S category
tooltip

A

Country

Brazil

Sector

Manufacturing

Status

Proposed

Disclosed date

11/09/2026

Projected date at which a project will be put forward for the Board of Executive Directors’ approval.

Projected board date
tooltip

01/18/2027

Approval date

N/A

Signed date

N/A

Sponsoring entity

N/A

Investment Operations Department Contact

Corporates Division

Investment type

Syndicated amount

USD $ 490,000,000

Financing amount

USD $ 100,000,000

Currency

USD

Project scope and objective

The proposed financing will support the development, construction and operation of the Piauí Nickel Project, a greenfield nickel and cobalt mining and processing project located in the state of Piauí, Brazil. In general, the Project comprises:

 

IDB Invest’s Senior Loan and potential participation will be up to US$415 million, including an A Loan and the leveraging of resources through B Loans, subject to satisfactory completion of due diligence and applicable approvals.The estimated cost of the Project is approximately US$1.5 billion. The A/B structure may allow for the mobilization of additional third-party resources to the Project.

 

The Project comprises an open-pit nickel laterite mine and associated facilities for crushing, heap leaching, sulfuric acid production, hydrometallurgical processing and ancillary infrastructure, located in the state of Piauí, Brazil. At full capacity, the Project is expected to produce approximately 28,000 tons of nickel, 1,000 tons of cobalt and 1,100 tons of copper per year during the first ten years of operation.

For information requests about the project.

Request information

Learn more about how we provide private-sector solutions in the region .

Early disclosure

PIAUÍ NICKEL - ENVIRONMENTAL AND SOCIAL STRATEGY (ESS)

553.0 Kb

Client files

This section provides the key environmental and social assessment documents produced by the client for this project.

02 ESIA SUMMARY REPORT

14.0 Mb

03 ESIA PNM VOLUME I ENGLISH TRANSLATION

6.8 Mb

04 ESIA PNM VOLUME II ENGLISH TRANSLATION

141.0 Mb

05 ESIA PNM VOLUME III ENGLISH TRANSLATION

4.0 Mb

3.6.2.4.2.1 EIA PNM VOLUME I

14.0 Mb

3.6.2.4.2.2 EIA PNM VOLUME II

14.0 Mb

3.6.2.4.2.3 EIA PNM VOLUME III

3.5 Mb

3.6.2.4.2.4 EIA PNM VOLUME IV

14.0 Mb

3.6.2.4.2.5 RIMA PNM

14.0 Mb

For information requests about the project.

Request information

Learn more about how we provide private-sector solutions in the region .

Contact information

For information requests about the project.

Request information

Alternatively, you may also use the following contact information :

Client Contact

PHONE NUMBER

+44 772 685 5377

POST OFFICE ADDRESS

For information requests about the project.

Request information

Learn more about how we provide private-sector solutions in the region .