Company name
Sacos de Polipropileno Especializados, S.A. de C.V.
Project number
15900-01
Category A projects could result in potentially significant environmental and/or social risks and impacts, which are diverse, irreversible, or unprecedented that may extend beyond the boundaries of the actual project site or facilities. In principle, Category A includes projects which have significant impacts on protected or sensitive areas21 and/ or vulnerable groups.
E&S category
A
Country
Colombia
Sector
Transport
Status
Proposed
Disclosed date
12/15/2025
Projected date at which a project will be put forward for the Board of Executive Directors’ approval.
Projected board date
07/07/2026
Approval date
N/A
Signed date
N/A
Sponsoring entity
N/A
Investment Operations Department Contact
Infrastructure and Energy Division
Investment type
Syndicated amount
N/A
Financing amount
USD $ 200,000,000
Currency
COP, USD
Project scope and objective
The APP La Dorada – Chiriguaná Railway Corridor is a strategic initiative led by the National Infrastructure Agency (ANI) to reactivate freight rail transport in Colombia, promoting intermodality and logistical efficiency. The project involves the construction, rehabilitation, improvement, commissioning, operation, and maintenance of a railway corridor of approximately 525 kilometers, connecting the municipalities of La Dorada (Caldas) and Chiriguaná (Cesar), and crossing five departments and twenty-five municipalities. It also includes the modernization of administrative and operational infrastructure, such as control buildings, workshops, communication and signaling systems, as well as the construction of logistics centers for cargo transfer.
The scope of the project covers three main functional units: (1) the rehabilitation and operation of the railway corridor and its branches, (2) the construction and operation of administrative and operational control infrastructure, and (3) the logistics infrastructure for cargo transfer services. The project aims to strengthen connectivity between the country’s center and the Caribbean coast, boost foreign trade, energize local economies, and improve road and pedestrian safety in the areas of influence. It also encourages the hiring of local labor, the participation of regional suppliers, and the improvement of educational infrastructure, contributing to environmental sustainability through the reduction of CO₂ emissions and efficient resource use.
For information requests about the project.
Request informationLearn more about how we provide private-sector solutions in the region .
Contact information
For information requests about the project.
Request informationAlternatively, you may also use the following contact information :
Client Contact
PHONE NUMBER
+573183348247
POST OFFICE ADDRESS
Avenida Carrera 9 No. 115 – 06 Bogotá, Colombia.
For information requests about the project.
Request informationLearn more about how we provide private-sector solutions in the region .

Early disclosure
For projects with high environmental or social risk an Environmental and Social Strategy (ESS) is prepared early on during the project appraisal and prior to carrying out the environmental and social due diligence (ESDD). The ESS includes the initial E&S risk categorization and a brief description of potential Performance Standards applicable to the project. The ESS for this project is available below. Together with the ESS, IDB Invest also provides access to the client’s preliminary E&S documents that will be reviewed during the ESDD. The client E&S documents for this project can be found under the “CLIENT FILES” section below. Once the environmental and social due diligence is completed, an Environmental and Social Review Summary (ESRS) for the Project will be published on this page.
FFCC LA DORADA-CHIRIGUANÁ - ENVIRONMENTAL AND SOCIAL STRATEGY (ESS)
215.0 Kb