Skip to main content

Company name

Sacos de Polipropileno Especializados, S.A. de C.V.

Project number

15900-01

Category A projects could result in potentially significant environmental and/or social risks and impacts, which are diverse, irreversible, or unprecedented that may extend beyond the boundaries of the actual project site or facilities. In principle, Category A includes projects which have significant impacts on protected or sensitive areas21 and/ or vulnerable groups.

E&S category
tooltip

A

Country

Colombia

Sector

Transport

Status

Proposed

Disclosed date

12/15/2025

Projected date at which a project will be put forward for the Board of Executive Directors’ approval.

Projected board date
tooltip

07/07/2026

Approval date

N/A

Signed date

N/A

Sponsoring entity

N/A

Investment Operations Department Contact

Infrastructure and Energy Division

Investment type

Syndicated amount

N/A

Financing amount

USD $ 200,000,000

Currency

COP, USD

Project scope and objective

The APP La Dorada – Chiriguaná Railway Corridor is a strategic initiative led by the National Infrastructure Agency (ANI) to reactivate freight rail transport in Colombia, promoting intermodality and logistical efficiency. The project involves the construction, rehabilitation, improvement, commissioning, operation, and maintenance of a railway corridor of approximately 525 kilometers, connecting the municipalities of La Dorada (Caldas) and Chiriguaná (Cesar), and crossing five departments and twenty-five municipalities. It also includes the modernization of administrative and operational infrastructure, such as control buildings, workshops, communication and signaling systems, as well as the construction of logistics centers for cargo transfer.

The scope of the project covers three main functional units: (1) the rehabilitation and operation of the railway corridor and its branches, (2) the construction and operation of administrative and operational control infrastructure, and (3) the logistics infrastructure for cargo transfer services. The project aims to strengthen connectivity between the country’s center and the Caribbean coast, boost foreign trade, energize local economies, and improve road and pedestrian safety in the areas of influence. It also encourages the hiring of local labor, the participation of regional suppliers, and the improvement of educational infrastructure, contributing to environmental sustainability through the reduction of CO₂ emissions and efficient resource use.

For information requests about the project.

Request information

Learn more about how we provide private-sector solutions in the region .

Early disclosure

For projects with high environmental or social risk an Environmental and Social Strategy (ESS) is prepared early on during the project appraisal and prior to carrying out the environmental and social due diligence (ESDD). The ESS includes the initial E&S risk categorization and a brief description of potential Performance Standards applicable to the project. The ESS for this project is available below. Together with the ESS, IDB Invest also provides access to the client’s preliminary E&S documents that will be reviewed during the ESDD. The client E&S documents for this project can be found under the “CLIENT FILES” section below. Once the environmental and social due diligence is completed, an Environmental and Social Review Summary (ESRS) for the Project will be published on this page.

FFCC LA DORADA-CHIRIGUANÁ - ENVIRONMENTAL AND SOCIAL STRATEGY (ESS)

215.0 Kb

Environmental and social review

IDB Invest conducts an environmental and social due diligence (ESDD) commensurate with the nature, scale, and stage of the project, and with its level of environmental and social risks and impacts. The ESDD will confirm the project E&S categorization and assess the project with respect to the client requirements in IDB Invest Environmental and Social Sustainability Policy. The results of the ESDD, including any identified gaps are described in the Environmental and Social Review Summary (ESRS) provided below. For projects approved as of 2016, any gaps with respect to IDB Invest's Environmental and Social Sustainability Policy at the time of the ESDD are addressed in the Environmental and Social Action Plan (ESAP) presented below, to comply with the date mentioned above.

RAILWAY CORRIDOR LA DORADA – CHIRIGUANÁ - ENVIRONMENTAL AND SOCIAL ACTION PLAN (ESAP)

378.9 Kb

RAILWAY CORRIDOR LA DORADA – CHIRIGUANÁ - ENVIRONMENTAL AND SOCIAL REVIEW SUMMARY (ESRS)

962.6 Kb

For information requests about the project.

Request information

Learn more about how we provide private-sector solutions in the region .

Contact information

For information requests about the project.

Request information

Alternatively, you may also use the following contact information :

Client Contact

PHONE NUMBER

+573183348247

POST OFFICE ADDRESS

Avenida Carrera 9 No. 115 – 06 Bogotá, Colombia.

For information requests about the project.

Request information

Learn more about how we provide private-sector solutions in the region .